1985
First model
Founder’s Garage, El Biar, Algeria
The future of reclaim operations
From the first spark of an idea to major international installations, by Jean-Claude Poncet, founder and president of Vibrafloor.

In the summer of 1973, I was travelling through North America. In Vancouver, I just managed to catch a Greyhound bus bound for Montréal. A meeting on board led me to Thunder Bay, Ontario.
The following spring, I joined CD Howe, an engineering company specialising in grain silo design. That is where it all began.
My career then took me to Montréal and McGill University, where I studied structural analysis, followed by Lebanon and Algeria. With each project, I learned to design silos, supervise their construction and understand the challenges faced by the people operating them.
In the 1980s, I was presenting a new dome silo concept to Algerian grain industry representatives.
“They have flat bottoms. How do you empty them?”
I explained how a rotating sweep auger worked, while acknowledging that some grain would remain on the floor and would have to be removed manually.
Their response changed the course of my career:
“No, sir. We do not sweep. It has to be self-cleaning.”
I had no solution. But now I had a question to solve.
My first prototype was a small board inclined on a painting easel, fitted with an electric toothbrush: the only vibrating device I had available.
The wheat grains moved down the slope.
I continued testing in my garage in Algiers and filed the first vibrating floor patent in January 1985. After an unsuccessful attempt, changing the position of the vibrator got the model working.
Back in France in 1987, the Cérégrain cooperative agreed to a trial in a storage cell at the port of Mâcon. Several months of experimentation followed. By September, we were able to empty it almost completely.
Silexport, the company from which Vibrafloor grew, was founded in December 1987. In 1988, the invention received the State of Geneva Prize and a gold medal at the International Exhibition of Inventions in Geneva.
The company established itself in Saint-Boil, Burgundy. Projects in Germany, Taiwan and maritime transport gradually helped the technology evolve.
The MRS Pioneer sugar carrier, equipped in 1996, and the Drax project in the United Kingdom, launched in 2011 with four domes measuring sixty-three metres in diameter, marked major milestones.
This progress owes much to the customers and partners who placed their trust in us, and to the teams who turned an invention into industrial equipment. Every challenge informed our research and improved our expertise.
Today, Pierre Laubignat and the Vibrafloor team are continuing this journey. Research into cohesive materials has notably led to the development of WaveFloor technology, protected by a new patent.
Since that first handful of wheat on a small board, our ambition has remained the same: to make bulk material reclaim easier and reduce manual intervention.
A question from the field gave rise to Vibrafloor. Our customers’ needs continue to drive us forward.
Jean-Claude Poncet — October 2026
Scroll horizontally to explore the projects. Select a photo to view it in full.
1985
Founder’s Garage, El Biar, Algeria
1987
Cooperative Cérégrain, France
1987
Before our CEO was self-employed
1991
Soya Mainz, Germany
09/1994
Name change
1996
4 Holds Ø20x20m
Australia
2000
1 silo 11.5m
Landemont, France
2001
1 silo 38.5x27m
Languedoc, Aigues Mortes, France
2006
1 silo 14x12m
Burgundy – Moneteau, France
2008
1 silo Ø10.7m
Denmark
2008
8 cells 14x14m
Baleycourt, France
01/2009
2009
20 silos 9.2×9.2m
Belgium
09/2011
2012
for R&D in Givry
2012
1 silo Ø22m
Fontaine-le-Dun (SI.DE.FO.) – France
2012
4 silos Ø63m
Drax Power Station, UK
2013
10 silos 13.5×13.5m
& 2 silos 8.1×8.1m
Cap Seine – Bertreville, France
2013
1 silo Ø36.5m
Immingham, UK
2013
3 silos Ø45m
Port of Tyne, UK
2014
2014
8 silos 9.2×9.2m
Faye sur Ardin, France
12/11/2014
2015
3 silos Ø40m
Gladstone, UK
2015
1 silo Ø34.3m
Copenhagen, Denmark
01/2016
2016
2 silos Ø8.1m
Sri Lanka
2016
2 silos Ø18m
Ecuador
2016
3 silos Ø45m
Port of Tyne, UK
2018
1 silo Ø25m
Netherlands
2018
2018
8 silos Ø11m
South Africa
2019
6 silos Ø17.7m
Qatar
2020
8 silos Ø16.7m
Japan
2021
2 silos Ø50m
La Réunion
2021
2 silos Ø7.5m
Poland
2022
2 silos Ø50m
La Réunion
2022
16 silos Ø26m
Teesside, UK
2023
28 silos 5.391 x 2.242 m
Ulsteinvik, Norway
2024
1 dome Ø26.2 m
Kütahya, Türkiye
12/11/2014
2015
2 silos Ø23
Porto Santana – Brazil
2015
1 silo Ø23
Itaituba – Brazil
2016
1 silo Ø15
Ipameri, Goias – Brazil
2021
4 silos Ø22
São Simão – Brazil
2024
2 silos Ø30
Santos – Brazil
LET’S TALK ABOUT YOUR PROJECT
Tell us what you store and how you need to unload it. Let’s explore the right configuration together.